The second lift of the main staircase is being formed. After a lot of wrangling over the measurements, number of steps, start position etc the formwork is going in and hopefully ready for pouring next week - the idea will be to get this framed up and then get the roofs shuttered up for pouring and hit them at the same time. This will give us access to all floors and a weather-tight house for fitting.
From my jobs, yesterday was mortaring up the joints in some of the window sills. A good evenings work. The HRV is fully ducted and nothing more to do on that until we're slabbed and skimmed.